Built for Outcomes
Hodgson Corp delivers multi-disciplinary projects—mechanical, electrical, civil, and controls—optimized for uptime, efficiency, and safety. Explore selected engagements showing how we reduce risk, compress schedules, and increase throughput with rigorous engineering and on-site execution.
At a Glance
- Design–Build • EPC • Turnkey Retrofits
- Brownfield & Live-plant Workflows
- ISO-aligned QA/QC • Safety-first culture
Filter Case Studies
Select filters to locate relevant examples. Open a card for approach, timeline, and measured results.
Selected Projects
Root-cause analysis across conveyors, filler, and CIP windows. Introduced parallel buffering and smarter changeovers using SMED.
- Throughput +22% without new major equipment
- Changeover time −35% (12 → 7.8 min)
- OEE +9 pts in 60 days
Designed VFD-driven pumps with solar array and SCADA upgrades. Seamless switchover logic stabilized pressure and cut peak draw.
- Energy cost −28% YoY
- Unplanned outages −60%
- Payback < 3.5 years
Inserted AMR fleet and pick-to-light within existing racking. Nightly rollout minimized disruption; safety zones defined with LIDAR.
- Order cycle time −31%
- Picking accuracy 99.6% (+1.8 pts)
- Recordable incidents −40%
Rebalanced airflow with variable volume control and HEPA zoning while maintaining ISO class during phased shutdowns.
- Yield losses due to temp drift: −80%
- Energy intensity −18%
- cGMP audit: zero critical findings
Guarding, interlocks, and LOTO improvements aligned to ANSI/ISO; operator training and digital work instructions deployed.
- TRIR −52% within 12 months
- MTBF +17%
- Start-up defects −23%
PLC migration with hot cutover, historian, and predictive maintenance alerts to reduce chemical use and leaks.
- Chemical consumption −15%
- Leak events −70%
- Operator response time −40%
Our Delivery Method
- Discover: site assessment, risk register, and baseline KPIs.
- Design: 3D/BIM coordination, HAZOP, constructability reviews.
- Build: phased execution with QA/QC checkpoints and live-plant safety plans.
- Commission: FAT/SAT, training, O&M handover, and performance validation.
- Optimize: post-go-live tuning and continuous improvement sprints.
- Standards: NFPA, NEC, ASME, ISO 9001-aligned QA
- Safety: LOTO, confined space, hot work permits, JSAs
Industries
- Discrete & Process Manufacturing
- Power, Water & Wastewater Utilities
- Food & Beverage, Cold Chain
- Pharma, MedTech & Cleanroom Environments
- Logistics, Warehousing & Distribution
Typical Results
- OEE +5–20 pts in first 90 days
- Energy intensity −10–30%
- Planned vs. actual schedule variance < ±5%
- Safety incident rates reduced 30–60%
Discuss Your Project
Share scope, constraints, and target outcomes. We’ll outline a phased plan with clear milestones and risks.